Solar Hybrid Installation
Turnkey solar-hybrid site delivered for IPT on the MTN network in the South-East.
About the project
On the MTN network, working for IPT, Evergreen delivered a turnkey solar-hybrid site in the South-East. Telecom sites need power that never stops, and diesel-only sites are expensive to run. Our hybrid design pairs solar generation with storage and backup so the site stays up while cutting fuel costs and emissions — the model we believe is the future of telecom power across the region.
Challenge, solution, outcome
Challenge
Telecom sites demand near-continuous uptime, and diesel-only power is costly and carbon-heavy.
Solution
We delivered a turnkey hybrid site — solar, storage, and intelligent backup — sized to keep the site live while minimising diesel runtime.
Outcome
A live solar-hybrid telecom site on the MTN network, delivering reliable power at a lower operating cost.
Project timeline
Site survey & design
CompletedFeb 1, 2021 — Mar 15, 2021
Load assessment and hybrid system design.
Build & install
CompletedMar 16, 2021 — Jun 15, 2021
Turnkey civil works, solar, and storage installation.
Commissioning
CompletedJun 16, 2021 — Jul 31, 2021
Hybrid controls, commissioning, and handover.
Who delivered it
Emmanuel Kondé
Renewable Energy Lead
Solar and hybrid systems engineer.
Patrick Mbah
Electrical Engineer
Site electrical and controls.
With
Tags
On site
Images and video from the project.
Have a project like this?
Tell us your scope and timeline — a senior lead will respond within one business day.