Harbor View Tower tops out ahead of schedule
The reinforced-concrete frame reached full height this month — a milestone delivered two weeks inside the programme.

A 12-story landmark blending retail, office, and residential life on the Douala waterfront.
Delivered as a turnkey design-build, the Harbor View Tower integrates retail at street level, six floors of Grade-A office space, and five floors of premium residences. The project introduced a hybrid energy system reducing grid dependency by 35%.
A waterfront site with a high water table and a hard delivery deadline tied to anchor-tenant lease commitments left no slack in the programme.
We dewatered and reinforced the substructure early, ran a 14-week rolling procurement calendar for long-lead façade and MEP packages, and sequenced floors so fit-out trailed the structural frame by a fixed offset.
Handed over on schedule and under budget, with the hybrid energy system cutting the building's grid dependency by 35% from day one.
Jan 15, 2023 — Apr 30, 2023
Design-build coordination, geotechnical study, and statutory approvals.
May 1, 2023 — Sep 15, 2023
Dewatering, piling, and reinforced foundation on a high-water-table site.
Sep 16, 2023 — Jun 30, 2024
Reinforced-concrete frame and core to full height across 12 floors.
Apr 1, 2024 — Nov 30, 2024
Curtain-wall, hybrid energy system, and mechanical/electrical/plumbing coordination.
Oct 1, 2024 — Feb 28, 2025
Retail and residential fit-out, commissioning, snagging, and handover.
Project Director
PMP-certified construction lead; ex-Bouygues.
Lead Electrical Engineer
Headed the MEP and hybrid energy integration.
Energy Systems Lead
Designed the rooftop solar + storage architecture.